Skip to content

Underground Overhauls

Underground Implements

7 day turn time

Beltor has been overhauling underground mining implements for almost 50 years. With industry leading turn times, Beltor is a preferred implement overhaul contractor for a number of major mining companies.

Boot ends
Buckets
Cable basket
Cable boats
Cable carrier
Cable extension pod
Cable pods
Chain pods
Concrete kibble
Crib pod
Crib pod with deputy station

Dozer blade
Duck bill blade
Duckbill
Duckbill narrow
Duster
Explosive pod
Fines pod
Fish tank
Fitters pod
Fork – varied sizes
Fuel pod

Jibs (various)
Lube pod
Maintenance pod
Man basket
Mesh carrier
Pipe basket
Pipe platform
Reel transport sleds
Roof bolt cassettes
Spares pod
Structure pod

Supply pod
Tool boxes
Trailer
Pods (Various)
Winder – fixed leg type
Winder – hydraulic leg type
Winder trailer
Winders
Work platform
Workstations

Beltor also provides extensive certification and NDT compliance reports.

Beltor Optix

All of our customers benefit from Optix – Beltor’s asset management program. Optix is the next generation in implement asset management. It ensures that your assets are performing at their optimum and your compliance is met

Longwall Systems

Beltor has designed, engineered, manufactured and installed a number of longwall components.

We design, manufacture and install:

Side shields
Flushing shields
Flippers
Relay bars
Pans, spill plates and dagger plates

BSL components
Crusher components
Monorail cassettes
Monorail systems
Roof support

Auxiliary Fan Overhauls

Beltor has extensive experience in the manufacture, overhaul and modification of Auxiliary Fans. Benefit from our years of evolved design. Providing lower noise and more efficiency.  Options include the design of specialised hydraulic levelling jacks to enable ease of site installations and reduction of plant vibration. Full electrical equipment and explosion protection AS3800 compliance overhaul available.

We have been at your service since 1975, providing robust engineering